TY - GEN
T1 - Engineering tools for the integration of service-oriented production systems
AU - Leitão, Paulo
AU - Mendes, J. Marco
AU - Bepperling, Axel
AU - Cachapa, Daniel
AU - Colombo, Armando W.
AU - Restivo, Francisco
N1 - Copyright:
Copyright 2011 Elsevier B.V., All rights reserved.
PY - 2009
Y1 - 2009
N2 - Engineering frameworks are currently required to support the easy, low-cost, modular and integrated development of production systems, addressing the emergent requirements of re-configurability, responsiveness and robustness. This paper discusses the integration of High-level Petri net-based service-oriented frameworks with 2D/3D engineering tools, allowing the digitally design, configuration, validation, simulation, control and monitoring of production systems, in an integrated manner. An experimental case study was implemented, based on the Petri nets development toolKit (PndK) development framework, to validate the proposed concepts.
AB - Engineering frameworks are currently required to support the easy, low-cost, modular and integrated development of production systems, addressing the emergent requirements of re-configurability, responsiveness and robustness. This paper discusses the integration of High-level Petri net-based service-oriented frameworks with 2D/3D engineering tools, allowing the digitally design, configuration, validation, simulation, control and monitoring of production systems, in an integrated manner. An experimental case study was implemented, based on the Petri nets development toolKit (PndK) development framework, to validate the proposed concepts.
UR - http://www.scopus.com/inward/record.url?scp=79960905728&partnerID=8YFLogxK
U2 - 10.3182/20090603-3-RU-2001.0172
DO - 10.3182/20090603-3-RU-2001.0172
M3 - Conference contribution
AN - SCOPUS:79960905728
SN - 9783902661432
T3 - IFAC Proceedings Volumes (IFAC-PapersOnline)
SP - 1772
EP - 1777
BT - Proceedings of the 13th IFAC Symposium on Information Control Problems in Manufacturing, INCOM'09
T2 - 13th IFAC Symposium on Information Control Problems in Manufacturing, INCOM'09
Y2 - 3 June 2009 through 5 June 2009
ER -