Risk assessment in 5G infrastructure deployment: an aid tool for estimating spectrum auction prices

Marco Araújo, Love Ekenberg, João Confraria

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

2 Citations (Scopus)

Abstract

Risks are significant when implementing large-scale projects such as 5G. The higher the overall risk of the 5G project, the lower the operators' willingness to invest in millimetre wave spectrum and vice-versa; i.e. the price of the spectrum should be negatively correlated with the overall project risk. In this paper, we propose an array-based method for estimating financial risks when introducing 5G and its correspondence with spectrum prices. The method is based on Monte Carlo simulations, for deriving an appropriate maximum value for the operator' willingness to pay for a 5G license.
Original languageEnglish
Title of host publication2019 IEEE Wireless Communications and Networking Conference Workshop, WCNCW 2019
PublisherInstitute of Electrical and Electronics Engineers Inc.
Number of pages6
ISBN (Electronic)9781728109220
DOIs
Publication statusPublished - Apr 2019
Event2019 IEEE Wireless Communications and Networking Conference Workshop, WCNCW 2019 - Marrakech, Morocco
Duration: 15 Apr 201918 Apr 2019

Publication series

Name2019 IEEE Wireless Communications and Networking Conference Workshop, WCNCW 2019

Conference

Conference2019 IEEE Wireless Communications and Networking Conference Workshop, WCNCW 2019
Country/TerritoryMorocco
CityMarrakech
Period15/04/1918/04/19

Keywords

  • 5G
  • BetaPERT
  • Monte Carlo
  • Risk

Fingerprint

Dive into the research topics of 'Risk assessment in 5G infrastructure deployment: an aid tool for estimating spectrum auction prices'. Together they form a unique fingerprint.

Cite this